Small Pond Approval

Small pond plan submittals must be prepared according to the Charles SCD Small Pond Approval Guidelines (2025).

***As-Built documentation must be provided to the Charles SCD by the designated Engineer-In-Charge (EIC) within sixty (60) days following substantial completion of pond construction.***

Submit completed checklist and all documents to submit@charlesscd.com. Charles SCD Small Pond AS-BUILT Checklist